2012 Liaoning Hongyanhe nuclear power generating units put into operation



2012 Liaoning Hongyanhe nuclear power generating units put into operation

April 26, the first furnace of the Liaoning Hongyanhe Nuclear Power Unit 1 of the first batch of fuel assemblies on schedule successfully delivered to red along the nuclear site. The nuclear fuel transport is the first all-road transport modes, and the whole of 3017 km.power adapter for laptop.

Liaoning Hongyanhe nuclear power company has led the establishment of a fuel to receive the special group,12 v adaptor. the splicing operation of the overall arrangements for the scene, the physical protection of material minimum system, radiation protection, local coordination, etc., to ensure field splicing conditions to realize such.

The Red river on the 1st unit put into commercial operation at the end of 2012. The first batch of fuel assemblies to the factory marks Hongyanhe nuclear power from nuclear-free to a major shift in nuclear loading schedule for the realization of creating favorable conditions for merchant shipping. The second batch of fuel assemblies to the plant in late May.


Tags:
f